Nikolaevsk pipeline

A significant project for us was the "pipeline bend to Nikolaevsk-on-Amur." The pipeline supplies gas to local power station, which determin entirely life of the city of Nikolaevsk-on-Amur. Our group of companies involved in the design of equipment, its manufacturing and delivery. It made installation and commissioning. The pipeline was put into operation on 10 October 2008.

Despite the relatively small length of the pipeline (218 km), under its design and construction the most advanced technology and equipment were used. The pipeline route runs in a remote marshland and its cross more than 70 rivers and streams. Under the Amur River two branches of the underpass were laid . All equipment is provided by a linear power supply autonomous power stations installed on the crane sites. Fiber-optic line paved trails along delivers eat and transmission of telemetry data in the operator points at Nikolaevsk-on-Amur and Khabarovsk.

The unit of gas counting on the basis of ultrasonic meter installed on the inlet of a gas lateral, can measure bi-directional flow of gas, which increases tochost settlement.

We carried out a comprehensive inspection of all equipment and eliminated identified in the 2009 shortcomings. Currently, we carry out maintenance of the facility. Experience of participation in a complex of works from design to operation allows us to develop basic criteria and approaches to the autonomous power supply sources crane pads. Our technical proposal on the establishment of an autonomous power supply and control points APEC, we are ready to provide to all relevant design and operating organizations.

foto.jpgimg_0976.jpg